Blast furnace major repairs ¹ 2 metal works in El- Hadzhare (Annaba, Algeria).
In December, 2009 of Joint-Stock Company "Trust Uraldomnaremont" within the limits of major repairs of a blast furnace ¹2 in volume 2000 ì3 has executed replacement of the loading device, the basic koloshnokovs’ rings was repaired and partially underkoloshnikovs’ beams was replaced.
Operation time has made 9 days – from December, 9th till December, 18th. Such duration is connected with parallel performance of works by other contractors –guniting furnace mines, partial replacement of refrigerators of mine of a blast furnace.
In total for performance of a spadework and main works 49 persons were involved.
All necessary adjustments and options of knots of the loading device was accepted by the Customer from the first presentation.
The management metal works Ale-Hadzharsky has expressed gratitude to the executor for timely and qualitative performance of contract amount of works and has made the proposal to continue teamwork in the field of repairs of metallurgical units.
|