Reconstruction of a blast furnace ¹3 Enakievsky metal works (Ukraine) proceeds
Following works are conducted on reconstruction of the blast furnace ¹3 (photos ¹1) during the given period:
Dismantle of the old air-heater (a photo ¹2), a deduster (a photo ¹3), a casing of the old furnace, the inclined bridge, a machine hall, a building of BALES and a design of a bunker platform comes to an end.
On building of a new blast furnace installation of refrigerating plates, ring platforms of the furnace are conducted. (A photo ¹4)
There was begun the installation of the lining on air-heater ¹1, on air-heater ¹2 - the casing prechamber gathers, on air-heater ¹3 - under nozzle device is mounted. (a photo ¹5)
The fan is mounted during the building of the foundry court aspiration yard, gather corona-forming electrode and precipitating electrodes, the device of the base of an electropremise aspiration is conducted.
The bunker platform aspiration, the case of the electrofilter and a chimney is mounted during the building.
Excavations are finished on a construction of pump thermal power station-PVS, still proceeds the device of the bases of a platform of an air line of cold blasting of thermal power station-PVS.
|